PRODUCTS
Shripal Metal Limited has been providing quality industrial raw material for world class engineering projects, ranging from high-tech nuclear plants to extreme pressure endurable petrochemicals plants, from high speed production food & beverages plants to sterile medical equipment establishments. Over the years, the company has gained vast experience in understanding diversified business needs of the industry and is supplying high-quality products for new projects, expansion, diversification and maintenance of projects. Shripal Metal has played a key role as manufacturer as well as a trader for national and international projects.
-
Pipes
-
Pipe Fittings
-
Flanges
-
Fasteners
-
Plates
-
Rods
-
Structural Steel
-
Hollow Sections
FASTEST GROWING
INDUSTRIAL SUPPLIER & SUB-CONTRACTOR
SINCE 1976
Bangalore International
Airport (BIAL) T2 Project
SS Base Plate & SS Railing
Design | Fabrication | Erection
Main Contractor: L&T
Client: BIAL
Project Solution
The terminal is designed as a tribute to the Garden city of Bengaluru and passenger experience is meant to be a “walk in the garden,” according to news agency ANI.
Passenger handling capacity, counters of check-in and immigration doubled at the Kempegowda airport T2. With this, the airport is now able to handle between 5-6 crore passengers annually. The terminal has a capacity of 25 lakh and 100 counters. Shripal Metal Ltd. is proud to be a part of this modern monument, serving today and tomorrow.
Hyderabad International
Airport (HIAL)
SS Guard Rail & Glass Rail
Fabrication | Installation
Main Contractor: L&T
Client: HIAL
Project Solution
The project was envisaged as a synergistic ecosystem with Hyderabad International Airport as the core and surrounded by an Airport City, driving a host of commercial and social activities, aligned with the vision of the State Government and Government of India to develop Hyderabad into a world class Global city and a Preferred Destination for Investments. Conceived as a new Gateway to South & Central India, Hyderabad Airport was commissioned in a record time of 31 months and inaugurated on March 14, 2008, with an initial capacity of 12 million passengers per annum.
Mumbai Metro Stations
Churchgate & Hutatma Chawk
SS & Glass Rail
Fabrication | Installation
Main Contractor: L&T
Client: MMRC
Project Solution
The Aqua Line 3 of the Mumbai Metro,also known as Colaba-Bandra-SEEPZ Line, is currently under construction in Mumbai, India. When completed, the 33.5 km (20.8 mi) long line will be the first underground metro line in Mumbai, with 27 underground stations and one at-grade station. The line will will include connections to other metro lines, monorail, suburban rail, inter-city rail, and Mumbai Airport. Line 3 is expected to reduce road congestion, and to reduce the load on the Western Line between Bandra and Churchgate.
CIDCO
Taloja & Bomandongri
SS Safety Grill
Fabrication | Installation
Main Contractor: L&T
Client: CIDCO
Project Solution
Navi Mumbai real estate market has a range of property options in various price brackets. Taloja & Bamandongri are one of the localities known for housing affordable residential projects which makes it a suitable destinations for homebuyers looking for a property for self-use or investment purposes in the city. One thing that makes Navi Mumbai different from any other city in this region is its potential to attract investors through its flourishing job market and employment opportunities, bringing in fresh housing demand regularly.
ITC ONE
Shri Lanka Colombo
SS Railing, Gratings, Fin Brackets
Fabrication | Supply
Main Contractor: L&T
Client: ITC
Project Solution
A two-tower behemoth, ITC Colombo will have a hotel tower of 29 floors with 371 rooms and a residential tower of 49 floors and 143 high-end residential units bordering the Indian Ocean and a lake on either side. A 54 m sky bridge will link the two towers that is all set to redefine the Colombo skyline.